
| 1 | A well type intake structure along with an approach channel on the upstream of the left bank hill mass, and with the control gates, |
| 2 | A 5 m Dia and 97.5m long. RCC lined headrace tunnel driven through the left bank hill mass and ending in the Single MS steel penstock bifurcating in to two at the power house |
| 3 | A RCC surface power house structure housing the two vertical axis Kaplan turbine generators of 4500 kW Capacity each |
| 4 | Tail race stop log gates |
| 5 | Tail pool discharging into the left bank canal, with a discharging capacity of 56 cumecs. |
![]() |
![]() |
![]() |
![]() |