| 1 | A diversion weir across the waste weir channel of the forebay |
| 2 | An intake structure, diverting the water |
| 3 | A 1800mm dia steel penstock about 210m long, and trifurcating into 3 Nos. penstocks of 900mm Dia and 20m long each near the power house |
| 4 | Surface power house with RCC structure and sheet roofing to house the 3 Nos. horizontal axis Francis Turbine generating units and |
| 5 | A short tail race channel to lead the water back to the Cauvery river. The work was completed in period of 18 months. |
![]() |
![]() |
![]() |
![]() |