Anusha Mini Hydel Scheme 4 MW
Purpose of the Project
1 State Andhra Pradesh
2 District Kurnool
3 Mandal Velugodu
4 River Galeru
5 Nearest Village Madhavaram
6 Nearest Town Nandyala (25km)
7 Nearest Railway Head Nandyala (35 km)
8 Nearest Air- Port Hyderabad (325 km)
Purpose of the Project
1 Purpose of the Project Generation and Transmission of Hydro Electric Power
Installed Capacity
1 Installed Capacity 2 x 2.0 MW
Annual Energy Generation
1 Annual Energy Generation 12.00 GWHr.
Hydrology
1 Maximum inflow during 2004-2008 2122.84 cumecs
2 Minimum inflow during 2004-2008 0.57 cumecs
3 Design Power Discharge 56.94 cumecs/ Unit, at rated head
4 Maximum Power Discharge 65.48 cumecs/ Unit, at minimum head & 115% of rated out put
5 Maximum design Flood (at Barrage site) 425 cumecs
6 Air Temperature:  
  Maximum 44° C
  Minimum 15° C
Diversion Barrage
1 Location Barrage across Galeru river, about 1.1km upstream of Madhavaram Bridge
2 Type Gated Ogee Barrage
3 FRL EL 225.20 m
4 MWL EL 227.50 m
5 MDDL EL.224.20m
6 Top of Non Overflow Section EL 229.0 m
7 Barrage Crest level EL.222.30m
8 Deepest foundation level EL 220.80 m
9 Average River bed level EL 221.80 m
10 Height of the Barrage (from deepest foundation level) 1.50 m
11 Length of Overflow Section 48.35 m
12 Length of Non overflow Section  
  Left side 36.5 m
  Right side 40.0 m
13 Total Length 124.85 m
14 Length of Aprroach Bridge (approximately ) 90 m
15 Flood discharge capacity of Barrage 425 cumecs
16 Flood Lift over Crest 2.90 m
17 Energy Dissipating Arrangement Stilling basin
18 Spillway Gates  
  i) Service Gates  
  a) Nos. 7
  b) Type Automatic falling gate
  c) Size 6.05 m x 2.90 m
  d) Sill Level EL.222.30 m
  e) Bridge Top Level EL.229.00 m
Approach Channel
1 Length 65.00m
2 Bed Slope 1:3500
3 Side Slope 1:1
4 Bed Width 43.00m.
5 Lining CC Lining to bed and sides
6 Bed Level at start EL 222.26
7 Bed Level at end EL 222.24
Intake Pool
1 Bed Level at Start EL 222.24
2 Horizontal Length of Pool 14.17m
3 Bed Slope 1V:2.5H
4 Bed Width Varies from 43m to 18.058m
5 Top of Guide Wall EL 229.0
INTAKE STRUCTURE
1 No of Vents 2
2 Vent Size 4.65 x 4.65
3 Sill Level EL 216.60m
4 Gates  
  a) Service Gates  
  No’s 2
  Size 4.65 x 4.65
  Type Vertical Lift Roller Gate
  Hoist Gantry
  b) Stop log Gates  
  No’s 1
  Size 4.65 x 4.65
  Type Vertical Lift Roller Gate
  Hoist Gantry
Power House
1 Location Left bank of Galeru river, adjacent to diversion barrage.
2 Type Surface type
3 Size of Machine Hall(outer to outer) 22.0 m x 18.10 m
4 Size of Service Bay (inner to inner) 22.0 m x 7.5 m
5 No. of Bays 2 unit bays and one Service bay
6 No. of Units and Capacity 2 Units of 2000 kW each
7 El. Of Turbine C/L EL 218.96 m
8 Generator Floor Level EL 218.76 m
9 Service/Equipment handling Bay EL 229.0 m
10 Draft tube floor Level EL 212.04 m
11 Max. TWL EL 221.13 m
12 Min TWL EL 219.66 m
Draft Tube Gates
1 Nos. 2
2 Type Vertical Lift Roller Gate
3 Size 6.20m X 3.42 m
4 Sill Level EL.212.04m
5 Hoist Level EL.229.0 m
6 Hoist Gantry Crane
Tail Race pool
1 Length (including Tail Race Pool) 21.18 m
2 Max. TWL EL.221.13m
3 High Flood Level (River) EL.227.50m
4 Bed Width Varying from 14.7 to 43 m
5 Design Discharge 131 cumecs
Tail Race Channel
1 Type Trapezoid Shape, Open Channel
2 Length 100 m
3 Bed width 43 m
4 Bed Gradient 1 : 3500
5 Side Slopes in rocks 1 (V) : 0.25 (H)
Turbines
1 Type S- TYPE Kaplan.
2 Rated Output 2000 kW
3 Maximum Net Head 3.0 m
4 Minimum Net Head 5.46 m
5 Rated Head 4.20 m
6 Rated Discharge per unit 56.94 cumecs
7 Maximum Discharge per unit 65.48 cumecs
8 Rated Speed 140 rpm
9 Runner Dia 3200 mm
10 Efficiency at rated output 92%
11 Continuous Over Load Capacity 20%
Generators
1 Type Synchronous generator coupled through Gear box
2 Rated Output 2000 kW
3 Generation Voltage 6.6 or 11 kV
4 Rated Speed 750 rpm
5 Efficiency 95 %
Transmission Lines
1 Length 10 km
2 Terminal Point Navya MHS
3 Type 33 kV Single Circuit line
Out Door Yard
1 Size Size
2 No. of Power Transformers One
3 Capacity of Power Transformer 6.3 MVA
4 Step up Voltage of Transformer 33 KV
5 Type ONAN
Cost
1 Estimated cost of Civil Works 1262.00 Lakhs
2 Estimated cost of E & M Works 880.00 Lakhs
3 Estimated cost of T -Transmission 395.00 Lakhs
4 Total Project Cost 2537.00 Lakhs
5 Total cost including Escalations and Interest During Construction 2699.00 Lakhs
Energy
1 Total Energy Generation 12.00 Mu
2 Saleable Energy 11.11 Mu
3 Cost of Energy Generation (1st Year) 3.46
4 Cost of Installation per kW 67,476.00
Implementation Schedule
1 Implementation Schedule 18 Months
 