| LOCATION | ||
| 1 | State | Karnataka |
| 2 | District | Mandya |
| 3 | Taluk | Malavalli |
| 4 | River | Cauvery |
| 5 | Latitude : | |
| a) Weir | 12° 17' 34" | |
| b) Power House | 12° 18' 13" | |
| 6 | Longitude : | |
| a) Weir | 77° 11' 09" | |
| b) Power House | 77° 11' 22" | |
| 7 | Nearest Village | Nettakallu Shimshapura (11.0) km |
| 8 | Nearest Town | Malavalli ( 27 km)/Maddur 54km |
| 9 | Nearest City | Bangalore (150 km) |
| 10 | Nearest Air- Port | Bangalore(150 km) |
| Purpose of the Project | ||
| 1 | Purpose of the Project | Generation and Transmission of Hydro Electric Power |
| Installed Capacity | ||
| 1 | Installed Capacity | 2 x 12000kW |
| Annual Energy Generation (at 75% dependabililty) | ||
| 1 | Annual Energy Generation (at 75% dependabililty) | 102.42GWHr |
| Hydrology | ||
| 1 | Catchment Area(Cauvery Basin in Karnataka) | 34,273 sq km |
| 2 | Design Power Discharge | 17.23 cumecs/ Unit, at rated head |
| 3 | Maximum Power Discharge | 21.07 cumecs/ Unit |
| 4 | Design Flood | 2000 cumecs |
| 5 | Air Temperature | |
| Maximum | 40.00° C | |
| Minimum | 17.00° C | |
| 6 | Average Humidity | 60 % |
| Diversion Weir | ||
| 1 | Location | D/S of Bharachukki Falls. |
| 2 | Type | Un-Gated, Gravity section built out of mass concrete |
| 3 | FRL | El 522.00 m |
| 4 | MWL | El 525.50 m |
| 5 | Top of Bridge / Non Overflow Section | El 527.00 m |
| 6 | Deepest Foundation level | El 512.00 m |
| 7 | Height of the weir: | 10.0 m |
| 8 | Length of Overflow Section | 140m |
| 9 | Length of Non Overflow Section | 14.48 m |
| 10 | Total Length | 154.48 m |
| 11 | Flood discharge capacity | 2000 cumecs |
| 12 | Flood Lift | 3.5 m |
| River Sluices | ||
| 1 | No of Vents. | 1 |
| 2 | Vent Size | 1.00 m x1.50m |
| 3 | Sill Level | 516.00m |
| 4 | Hoist Bridge Level | 527.00 mx |
| 5 | Design Discharge | 11 cumecs |
| 6 | Gates | |
| (a) Service Gate | ||
| Nos. | 1 | |
| Size | 1.00 m x 1.50m | |
| Type | Vertical lift roller gate | |
| Hoist | Screw rod hoist | |
| (b) Stop log Gate | ||
| Sets | 1 | |
| Size | 1.00 m x 1.50 m | |
| Type | Vertical lift roller gate | |
| Hoist | Screw rod hoist | |
| HRT Intake | ||
| Nos. | 1 | |
| Sill Level | EL.510.00 m | |
| Hoist Bridge Level | EL.527.00 m | |
| Design Discharge / Unit | 17.23 cumecs | |
| Gates | ||
| (a) Service Gate | ||
| Nos. | 1 | |
| Size | 6.0 m x 6.0 m | |
| Type | Vertical lift roller gate | |
| Hoist | Rope drum Hoist, remote operation from Powerhouse | |
| (b) Stop log Gate | ||
| Size | 6.0 m x 6.0 m | |
| Type | Vertical lift roller gate | |
| Hoist | Monorail & under slung Hoist | |
| Head Race Tunnel | ||
| 1 | Dia of the tunnel | 6.0 |
| 2 | Shape of tunnel | D shape, with CC lining, 250mm thick. Grade of Concrete: M-20, A-20 |
| 3 | Length of the tunnel | 1132 m |
| 4 | Sill Level at Starting | 510.00 m |
| 5 | Hoist Bridge Level | 527.00 m |
| 6 | Design Discharge / Unit | 17.23 Cumecs |
| 7 | Slope | 1 in 71 |
| Surge Shaft | ||
| 1 | Type | Simple |
| 2 | Diameter | 11.0 m |
| 3 | Max. Surge Level | EL.537.00 m |
| 4 | Min Surge Level | EL.502.00 m |
| 5 | Invert level | EL.493.00 m |
| 6 | Height | 45.00 m |
| 7 | Wall Thickness | 200 /500mm |
| 8 | Type of Wall | RCC M-20, A-20 |
| Penstock Tunnel | ||
| 1 | Shape | D shaped |
| 2 | Size | 5.00m dia |
| 3 | Flow | Pressure Flow |
| 4 | Length | 45.00 m |
| 5 | Steel Lining | 4.5 dia, Circular shape |
| Penstocks | ||
| 1 | Type | Steel Penstock, buried |
| 2 | No. of Penstock | 1 |
| 3 | Internal Dia. | 4.5 m |
| 4 | Length | 180.00 m |
| 5 | Shell Thickness | 8 mm to 16 mm |
| 6 | Branch line | |
| Dia | 2.3 m | |
| Thickness | 10 mm to 12 mm | |
| Length (Total) | 82 m | |
| Power House | ||
| 1 | Location | Left bank of River Cauvery |
| 2 | Type | Surface |
| 3 | Size of Machine Hall (outer to Outer) | 15.00 m x 23.20 m |
| 4 | Size of Service Bay | 15.00 m x 10.00 m |
| 5 | Size of Control room | 7m x 33.20 m |
| 6 | No. of Bays | 2 unit bays and one Service bay |
| 7 | No. of Units and Capacity | 2 Units of 12000 kW each |
| 8 | El. Of Turbine C/L | El 435.75 m |
| 9 | Generator Floor Level | El 442.25 m |
| 10 | Control Room Floor Level | El 442.25 m |
| 11 | Service/Equipment handling Bay Level | El 442.25m |
| 12 | Draft Tube floor Level | El 430.50 m |
| 13 | Max TWL | El 438.00 m |
| 14 | Min TWL | El 436.00 m |
| 15 | Draft Tube Gates | |
| No. of Vents | 2 | |
| Size | 5.00m x 2.00m | |
| Type | Vertical Lift fixed wheel roller gate | |
| No. of Sets | 2 with 1 elements each | |
| Hoisting Arrangement | Gantry Crane | |
| Tail Race Pool | ||
| 1 | Length | 16.72 m |
| 2 | High Flood Level (River) | El 438.00 m |
| 3 | Bed Width | 19.5 m |
| 4 | Side Slopes | 1:4 in Rock |
| 1:1 in Soft Rock and Soil | ||
| 5 | Design Discharge / unit | 17.23 cumecs |
| 6 | Bed Slope | 1 in 4 |
| 7 | Bed Levels | Varying from 431.32 m to 435.50m |
| Turbines | ||
| 1 | Type | Vertical Francis |
| 2 | Rated Output | 12500 kW |
| 3 | Maximum Net Head | 83.98 m |
| 4 | Minimum Net Head | 82.72 m |
| 5 | Rated Head | 83.11 m |
| 6 | Rated Discharge per unit | 16.66 cumecs |
| 7 | Maximum Discharge per unit | 19.96 cumecs |
| 8 | Rated Speed | 428 rpm |
| 9 | Runner Dia | 1740 mm |
| 10 | Efficiency | 92.00% |
| 11 | Continuous Over Load Capacity | 115% |
| Generators | ||
| 1 | Type | Synchronous generator |
| 2 | Rated Output | 12000 kW |
| 3 | Generation Voltage | 11 kV |
| 4 | Rated Speed | 428 rpm |
| 5 | Efficiency-Generator | 96 % |
| Transmission Lines | ||
| 1 | Length | 18.00 km |
| 2 | Terminal Point | 220/66 kV KPTCL sub station at Madhuvanahalli (n5e5.27ar Kollegal) |
| 3 | Type | 220/66 kV with double circuit Transmission Line with COYOTE conductor. |
| Out Door Yard | ||
| 1 | Size | 54.5 m x 26 m |
| 2 | No. of Power Transformers | 2 |
| Cost | ||
| 1 | Estimated cost of Civil Works | Rs.5563.00 Lakhs |
| 2 | Estimated cost of E & M Works | Rs.3840.00 Lakhs |
| 3 | Estimated cost of T –Transmission | Rs.872.00 Lakhs |
| 4 | Total cost including Escalations and Interest During Construction | Rs. 11794.00 Lakhs |
| Energy | ||
| 1 | Total Energy Generation (75% dependable) | 102.42 GWHr |
| 2 | Saleable Energy | 101.91 GWHr |
| 3 | Cost of Energy Generation (1st Year) | Rs.2.63 per unit |
| 4 | Cost of Installation per kW | Rs. 49,142/- |
| Implementation Schedule | ||
| 1 | Implementation Schedule | 27 Months |
![]() |
![]() |
![]() |
![]() |