| LOCATION | ||
| 1 | LOCATION | Near Jurreru and Kundu River confluence |
| 2 | State | Andhra Pradesh |
| 3 | District | Kurnool |
| 4 | Mandal | Nandyala |
| 5 | Village | Koilakuntla |
| 6 | River | Kundu |
| 7 | Koilakuntla MHS Reach | Near 83.05 km from exit of escape channel |
| 8 | Nearest Village | Koilakuntla |
| 9 | Nearest Town | Nandyala (32 km) |
| 10 | Nearest Railway head | Nandyala |
| 11 | Nearest Airport | Hyderabad (325 km) |
| Purpose of the Project | ||
| 1 | Purpose of the Project | Generation and Transmission of Hydro Electric Power |
| Installed Capacity | ||
| 1 | Installed Capacity | 2 x 3.8 MW |
| Annual Energy Generation | ||
| 1 | Annual Energy Generation | 20.88 GWHr. |
| Hydrology | ||
| 1 | Maximum Inflow during 2007-2008 | 1213.66 cumecs |
| 2 | Minimum Inflow during 2004-2005 | 0.25 cumecs |
| 3 | Design Power Discharge | 75.73 cumecs/ Unit, at rated head |
| 4 | Maximum Power Discharge | 87.09 cumecs/ Unit, at minimum head & 115 % of rated out put |
| 5 | Maximum design Flood (at Weir site) | 4843 cumecs |
| 6 | Air Temperature: | |
| Maximum | 42 °C | |
| Minimum | 15 °C | |
| Proposed Joladarashi Anicut by Irrigation Department of Andhra Pradesh: | ||
| 1 | Location | Upstream of Confluence of Jurreru and Kundu River |
| 2 | Type | Straight gated barrage |
| 3 | Global Co-ordinates | Latitude: 15o 14’ 0” N Longitude: 78o 20’ 1”E |
| 4 | Seismic Zone | Zone - II |
| 5 | Catchment area | 3338.75 Sq. km (1228.50 Sq. miles) 3300cum (+U/S Reservoirs surplus 1542.70 cumecs) 4873 cumecs (17018 cusecs) |
| 6 | FRL | EL +187.50 m |
| 7 | Top Bund Level | EL +192.50 m |
| 8 | Barrage Crest level | EL.182.00 m |
| 9 | MDDL | EL+180.00 m |
| 10 | Tailwater level at d/s of barrage | EL+185.93 m |
| 11 | Average River Bed Level | EL+180.00m |
| 12 | Foundation level | EL +177.00 m |
| 13 | Basin Floor Level | EL +180.00 m |
| 14 | Number of vents | 19 + 2 |
| 15 | Size of vents | 10.00 m x 5.50 m |
| 16 | Thickness of intermediate pier | 2.50 m |
| 17 | Length of Spillway (between abutments) | 260.00 m |
| 18 | Type of gate | Radial |
| Intake Structure | ||
| 1 | No. of Vents | 2 |
| 2 | Service gates size | 4.330 m x 5.5 m |
| 3 | Stoplog gate size | 4.330 m x 5.5 m |
| 4 | Trash Rack | 4.330 m x 16.6 m |
| 5 | Type of Hoists | |
| Service gate | Hydraulic Hoist | |
| Stoplog gate | Gantry crane | |
| Trash rack | ||
| Power House | ||
| 1 | Location | Downstream of left non over flow block of the proposed Joladarashi Anicut |
| 2 | Type | Surface type |
| 3 | Size of Machine Hall (outer to outer) | 12 m x 26.6 m |
| 4 | Size of Service Bay (inner to inner) | 12 m x 6.0 m |
| 5 | No. of Bays | 2 unit bays and one Service bay |
| 6 | No. of Units and Capacity | 2 Units of 3800 kW each |
| 7 | El. Of Turbine C/L | EL 179.4 m |
| 8 | Generator Floor Level | EL 182.4 m |
| 9 | Service/Equipment handling Bay | EL 187.5 m |
| 10 | Draft tube floor Level | EL 169.4 m |
| 11 | Max. TWL | EL 181.38 m |
| 12 | Min TWL | EL 179.9 m |
| Draft Tube Gates | ||
| 1 | Nos. | 2 |
| 2 | Type | Vertical Lift Roller Gate |
| 3 | Size | 4.330 m x 4.82 m |
| 4 | Sill Level | EL.169.4 m |
| 5 | Hoist Level | EL.187.5 m |
| 6 | Hoist | Gantry Crane |
| Tail Race pool | ||
| 1 | Length | 29.6 m |
| 2 | Max. TWL | EL.181.38 m |
| 3 | Min TWL | EL 179.9 m |
| 4 | High Flood Level (River) | EL185.9 m |
| 5 | Bed Width | Varies from 27.5 m to 55.0 m |
| 6 | Side Slopes | i) Rock- 1(V):0.25(H) ii) Soil -1(V):1(H) |
| 7 | Maximum Discharge | 174.18 cumecs |
| 8 | Bed level at start | EL + 169.6 m |
| 9 | Bed level at the end of pool | EL + 179.27 m |
| Tail Race Channel | ||
| 1 | Type | Trapezoid Shape, Open Channel |
| Bed level at start of Tailrace channel | EL + 179.27 m | |
| Bed level of Kundu river at confluence of TRC and river | EL + 179.19 m | |
| 2 | Length upto Kundu river | 260.0 m |
| 3 | Bed width | 55.0 m to 100.0 m |
| 4 | Bed Gradient | 1 : 3500 |
| 5 | Side Slopes in rock | 1 (V) : 0.25 (H) |
| 6 | Regrading the Kundu river | |
| 7 | Reach | From Tailrace channel joining point upto 50m downstream of Koilakuntla bridge. |
| 8 | Length of river proposed to be regraded | 1700 m |
| 9 | Bed width of the river | 100 m |
| 10 | Side slopes of the river after regrading | 1 : 3500 |
| Turbines | ||
| 1 | Type | Vertical Kaplan |
| 2 | Rated Output | 3800 kW |
| 3 | Maximum Net Head | 6.90 m |
| 4 | Minimum Net HeadMinimum Net Head | 3.95 m |
| 5 | Rated Head | 6.00 m |
| 6 | Rated Discharge per unit | 75.73 cumecs |
| 7 | Maximum Discharge per unit | 87.09 cumecs |
| 8 | Rated Speed | 130.40 rpm |
| 9 | Runner Dia | 4000 mm |
| 10 | Efficiency at rated output | 92 % |
| 11 | Continuous Over Load Capacity | 15 % |
| Generators | ||
| 1 | Type | Synchronous Generator |
| 2 | Rated Output | 3800 kW |
| 3 | Generation Voltage | 11 kV |
| 4 | Rated Speed | 750 rpm |
| 5 | Efficiency | 96 % |
| Transmission Lines | ||
| 1 | Length | 32 Km |
| 2 | Terminal Point | Nandyala 11/33/132KV APTRANS CO Sub-Station. |
| 3 | Type | 132 KV Single Circuit |
| Out Door Yard | ||
| 1 | Size | 29.0 x 57.0 m |
| 2 | No. of Power Transformers | 2 |
| 3 | Capacity of Power Transformer | 5 MVA |
| 4 | Step up Voltage of Transformer | 132 KV |
| 5 | Type | ONAN |
| Cost | ||
| 1 | Estimated cost of Civil Works | Rs.668.00 Lakhs |
| 2 | Estimated cost of E & M Works | Rs.1600.00 Lakhs |
| 3 | Estimated cost of T -Transmission | Rs.651.00 Lakhs |
| 4 | Total Project Cost | Rs.3467.00 Lakhs |
| 5 | Total cost including Escalations and Interest During Construction | Rs.3996.00 Lakhs |
| Energy | ||
| 1 | Total Energy Generation | 20.88 GWHr |
| 2 | Saleable Energy | 19.33 GWHr |
| 3 | Cost of Energy Generation (1st Year) | Rs.3.4 /GWHr |
| 4 | Cost of Installation per kW | Rs.52,580.00 |
| Implementation Schedule | ||
| 1 | Implementation Schedule | 24 Months |
![]() |
![]() |
![]() |
![]() |