| PROJECT COMPONENTS |
| 1 |
WEIR |
12 Months |
| |
Type |
Drop type trench weir |
| |
Elevation |
+/- 2082.00 m |
| |
Design discharge |
|
| |
Power Draft |
12.75 cumecs |
| |
Over load factor |
1.28 cumecs |
| |
Silt Flushing Discharge |
2.55 cumecs |
| |
Shingle Flushing discharge |
4.46 cumecs |
| |
Total discharge through trench weir = |
21.04 cumecs |
| |
Shingle Flushing System |
1.5 x 2.25 m. Conduit with gate at Inlet chamber |
| |
Longitudinal slope |
|
| |
Width |
3.50 m |
| |
Length |
40.00 m |
| 2 |
Intake Gate |
|
| |
No. |
1 |
| |
Size of the gate |
3.5 m x 4.0 m |
| |
Sill level of the intake |
2077.50 m |
| |
Type of gate |
Vertical lift gate |
| |
Type of hoist |
Mechanical chain pulley or motorized screw hoist |
| 3 |
Bed load flushing sluice |
|
| |
No. |
1 |
| |
Sluice size |
0.75 x 1.5 m |
| |
Length |
20 m |
| |
Size of the gate |
1.5 m x 2.5 m |
| |
Sill level of the inlet gate |
2075.50 m |
| |
Type of gate |
Vertical lift gate |
| |
Type of hoist |
Mechanical chain pulley or motorized screw hoist |
| 4 |
Approach Channel |
|
| |
Design discharge |
16.50 cumecs |
| |
Length |
30 m |
| |
Width |
3.5 m |
| |
Full supply depth |
3.85 m |
| |
Free Board |
1.5 m |
| |
Bed Slope |
1/1000 |
| |
Maximum velocity |
1.5 m/s |
| 5 |
Desilting Arrangement |
|
| |
Min. size of the particle to be eliminated |
200 µ |
| |
Type |
Surface DuFour (Hopper) |
| |
No. of units |
2 |
| |
Width of each unit |
6.50 m |
| |
Length |
125.00 m |
| |
Size of the flushing tunnel /pipe |
|
| |
Max. dia near exit |
0.9 m |
| |
Min. dia at the first hopper |
0.6 m |
| |
Flushing velocity |
4.00 m/s |
| 6 |
Head Race Tunnel |
|
| |
Type |
‘D’ shaped, concrete lined |
| |
Size |
|
| |
Radius of crown |
1.50 m |
| |
Base width |
3.00 m |
| |
Height upto spring level |
2.40 m |
| |
Equivalent radius |
3.70 m |
| |
Length |
4.15 km |
| |
Design discharge (with 10 % over load) |
14.03 cumecs |
| |
Velocity |
1.44 m/s |
| |
No. of adits |
2 |
| |
Invert level of inlet portal |
2078.35 m |
| |
Longitudinal slope |
1 in 500 |
| 7 |
Forebay |
|
| |
Type |
Underground |
| |
Max. water level |
2080.5 m |
| |
Min. water level (MDDL) |
2072.05 m |
| |
Height |
7 m |
| |
Length |
500 m |
| |
Width |
5 m |
| |
Storage capacity |
17500 cum |
| |
Sill of tunnel at exit |
2068.20 m |
| 8 |
Gates |
|
| |
Type |
Vertical gate |
| |
No. of gates |
1 |
| |
Size |
2 m x 2.5 m |
| |
Sill level |
2061.5 m |
| |
Length of transition |
5.5 m |
| |
Hoist level |
2088 m |
| 9 |
Penstock |
|
| |
No. of penstocks |
1 |
| |
Dia. of penstock |
2 m |
| |
Thickness of steel |
25 mm |
| |
Max. velocity through the penstock |
4.46 m/s |
| |
Length of penstock |
550 m |
| |
Type |
Surface, single penstock bifurcating into 2 near power house |
| |
Diameter of penstock after bifurcation |
1.4 m |
| |
Velocity |
4.39 m/s |
| 10 |
Power House |
|
| |
Size |
40 m x 16 m |
| |
Design power draft |
12.75 cumecs |
| |
Power draft with one unit operation |
6.38 cumecs |
| |
Max. power draft |
14.03 cumecs |
| |
Elevation |
+ 1836.50 m |
| |
Gross Head |
244 m |
| |
Net Head |
221.71 m |
| |
Installed capacity |
25 MW (2 x 12.5 MW) |
| |
Type of turbine |
Vertical Francis |
| |
Speed |
750 rpm |
| |
Specific speed |
98 |
| |
Generating units |
|
| |
Gross Energy at 90% dependability |
115.64 MU |
| |
Net Energy at 90% dependability |
99.73 MU |
| |
Gross Energy at 50% dependability |
142.30 MU |
| |
Net Energy at 50% dependability |
122.73 MU |
| |
Completed cost per MW |
Rs.799.00 Lakhs |
| |
Cost per unit (Rs.) for the first year at station bus bar |
|
| 11 |
Tail Race Channel |
|
| |
No. of channels |
2 |
| |
Discharge through each channel |
7.01 cumecs |
| |
Length |
25.00 m |
| |
Width |
3.50 m |
| |
Side slopes |
Vertical |
| |
Depth of flow |
2.00 m |
| |
Bed slope |
1/1000 |
| |
Size of tail race gates |
3.5 m x 2 m |
| |
Type |
Stop logs |
| |
Type of hoist |
Chain Pulley arrangement |